We translate engineer findings into a sequenced scope — what is structural, what is waterproofing, what can wait.

Florida SB 4-D · Milestone inspections
Associations can no longer defer concrete, waterproofing, and exterior systems. Shoreline scopes from the inspection and performs the work — one contractor, one schedule.
Florida’s milestone inspection program requires condominiums and cooperatives three stories and taller to inspect structural integrity — earlier if they sit near the coast. Reserve studies now must fund concrete, waterproofing, and exterior painting. Boards need a contractor who can execute the report, not just bid a paint job.
We translate engineer findings into a sequenced scope — what is structural, what is waterproofing, what can wait.
Spalling, exposed rebar, failed slabs, and balcony edges get rebuilt before anyone talks about color.
Coatings, wet seals, and joints so the next rainy season doesn’t reopen the same file.
Paint and coatings that match the building and survive salt, sun, and board photos.