Read the report with you
We translate engineer findings into a sequenced scope: what is structural, what is waterproofing, what can wait.

Florida SB 4-D · Milestone inspections
Associations can no longer defer concrete, waterproofing, and exterior systems. Shoreline scopes from the inspection and performs the repair work. One contractor, one schedule. We do not perform the statutory inspection itself.
Florida’s milestone inspection program requires condominiums and cooperatives three stories and taller to inspect structural integrity, earlier if they sit near the coast. Reserve studies now must fund concrete, waterproofing, and exterior painting. Boards need a contractor who can execute the report, not just bid a paint job. Work is performed under Florida license CGC1533739.
We translate engineer findings into a sequenced scope: what is structural, what is waterproofing, what can wait.
Spalling, exposed rebar, failed slabs, and balcony edges get rebuilt before anyone talks about color.
Coatings, wet seals, and joints so the next rainy season does not reopen the same file.
Paint and coatings that match the building and survive salt, sun, and board photos.
Mention that this is a milestone or SIRS-driven project. We’ll schedule a walkthrough with your manager.